General Construction Projects
- General Construction Projects
- MSK Group
1- DP228 – Hammar Mishrif to Hammar New TEG Pipeline and DP90 – Zubair IPF Liquids Recover
2- Installation pipeline CS 30” and total length 100 KM
3- Installation pipeline 48”/ FAW
4- Flowlines, Gathering Lines and Export Pipelines 28” Total length 20 KM/ Majnoon Oil Field
1- Carry out piping activities in DGS north /Zubair Oil Field / Samsung-ENI
2- Carry out piping activities in CPF / AHDAB Oil Field
1- Mechanical, Electrical & Instrumentation (ME&I) General Services for Majnoon Oil Field Development Well Pad 21
2- Mechanical, Electrical & Instrumentation (ME&I) General Services for Majnoon Oil Field Development Well Pad 28
1- Installation Flow tank in DGSN (Samsung)
2- Installation 12 Tanks/BADRA
1- Installation HDD 500 m 16”/Rumaila
2- Installation HDD 450 m 36”/Rumaila
3- Installation HDD 700 m 28”/Majnoon
4- Installation HDD 750 m 40”/Zubair
1- Installation Auger Boring 80 m 24” crossing high way/ Zubair
2- Installation Auger Boring 75 m 36” crossing asphalt road and existing pipes/ Majnoon
3- Installation Auger Boring 16” more than 100 asphalt road crossing / Zubair
1- Installation Pipe Rack inside CPF/ Ahdab
2- Installation Shelters multi size inside valve station/ Zubair
including loading and offloading heavy pumps, Gas separators chemical injection skids and manifolds
including civil activates inside Nasrya Depot, Civil activities in FFC and well pad yards
including installation sub stations, all required for well head instrument and OGM electrical and instrument
including pipeline assessment, Soil investigation, hydrotest and Pigging
including multi projects for Installation Tower for transfer electrical power 33KV, 132 KV and 400 KV
including Construction services for GRE pipeline 12-inch 100 KM in Halfaya Oil field and GRB 40-inch 30 KM in Zubair Oil Field
including construction temporary and permanent Cathodic Protection